Authority RCJY & SIRC Two independent agreements: site (RCJY) · CSA (SIRC — Saudi Investment Recycling Company, PIF subsidiary)

Jubail Industrial City

Saudi Arabia's primary petrochemical and industrial complex — nine material streams, the Kingdom's first circular-source REE processing from WtE ash, and zero Authority capital deployment.

100 TPD Phase Initial
1 module ACM Phase Initial
$55M Carbotura FDI
9 Material Streams
35,000 tpy Phase Initial Volume
Q2 2029 Estimated COD

Engagement Documents

SP-02

Feedstock Study

Nine material streams — 450 TPD addressable, 100 TPD Phase Initial. REE and critical minerals designation for ash fractions. SIRC subsidiary feedstock map. Scale gap analysis.

SP-01 · SP-KSA

Circular Offtake Proposal

CSA election framework (Options A / B / B+Exogenesis / A-IC). Ijarah + Musharakah structure. Dual-counterparty: SIRC (CSA) + RCJY (site). Zero Authority capital. Circular Sukuk pathway.

SP-01 · Finance

Economic Impact Report

State A vs State B 30-year delta. Employment: 47 direct FTE. Carbon avoidance: 133,225 tCO₂e/yr. MWAN: 35,000 tpy toward 2035 mandate. Critical minerals production from circular feedstock.

SP-01 · SP-KSA

In-Country Off-take Study

Three Saudi institutional anchor buyers: Ma'aden (REE suite), Saudi Aramco VRFB chain (V₂O₅), NEOM OXAGON (Neodymium, Gallium, Carbon Fiber). PIF bilateral alignment. In-country premium rationale.

SP-01 · SP-02

Executive Brief

Two structural gaps closed simultaneously. MWAN 2035 mandate. Critical minerals strategy. One action required by Q4 2026. Decision summary for municipal finance and authority stakeholders.

Authority

Partner Benefits

IKTVA alignment. Vision 2030 contribution pillars: SGI, NIDLP, MWAN, National Minerals Program. Employment: 47 direct FTE. In-Kingdom manufacturing at zero capital cost.

SOVEREIGN IMPACT · BALANCE SHEET

What this region exchanges

Waste cost eliminated / yr
SAR 10.2M ($2.7M)
FWDC × Phase 1 tpy ESTIMATED
Legacy landfill (ESTIMATED)
~5M tonnes
conservative estimate · site audit required ESTIMATED
Exogenesis Royalty TO Kingdom (total)
$250M (SAR 938M)
$50/tonne × legacy volume ESTIMATED
Exogenesis Programme annual royalty (Year 4–5)
$25M / yr (SAR 94M)
staggered start per regional COD ESTIMATED
CO₂e avoided / yr (Phase 1)
133,225 tCO₂e
133,225 × 1 modules · SA_15 locked rate ESTIMATED
Circular Royalty Stream 1 (Year 2)
$1.58M / yr
SA_15 placeholder rate ESTIMATED
Carbotura FDI (Phase 1)
$55M (SAR 206M)
1 modules × $55M LOCKED
Authority capital required
$0 USD (SAR 0)
no Authority outflow at any phase LOCKED

EXOGENESIS PROTOCOL · LEGACY LANDFILL REMEDIATION

Urban Mining — Near-Zero by Design

"The Exogenesis Protocol for Urban Mining — Carbotura's Near-Zero Emissions, Near-Zero Waste, Near-Zero Discharge approach to legacy landfill recovery. Operating under a sealed, advancing membrane enclosure with point-of-excavation gas capture via the Atmospheric Protection System (APS) and a fully electric, remotely operated excavation fleet. No personnel enter the enclosure under any operational condition."