Authority MODON & SIRC Two independent agreements: site (MODON — Saudi Authority for Industrial Cities) · CSA (SIRC — Saudi Investment Recycling Company, PIF subsidiary)

Riyadh

Saudi Arabia's national capital and largest waste-generating city — 21% of national waste, 10 modules at Phase Initial, $550M Carbotura FDI. Designed for Eid and Ramadan surge peaks that reach 1.4× baseline.

9,170
Baseline TPD
12,840
Surge TPD (P90)
1.4×
Surge Factor
Eid + Ramadan
Surge Driver
1,000TPDPhase Initial
10modulesACM Phase Initial
$550MCarbotura FDI
9Material Streams
350,000tpyPhase Initial Volume
Q2 2030Estimated COD

Engagement Documents

SP-02

Feedstock Study

Nine streams — 9,170 TPD baseline, 12,840 TPD surge (P90). Residential MSW 4,940 TPD, commercial 2,751 TPD. Qiddiya and Diriyah giga-project C&D. Eid/Ramadan surge design. SEEC and Yadoum operator map.

SP-01 · SP-KSA

Circular Offtake Proposal

CSA election framework (Options A / B / A-IC). Ijarah + Musharakah structure. Dual-counterparty: SIRC (CSA) + MODON (site). 10-module scale. Zero Authority capital. $550M Carbotura FDI commitment.

SP-01 · Finance

Economic Impact Report

State A vs State B delta. 470 direct FTE. 1,332,250 tCO₂e/yr avoided. 350,000 tpy MWAN contribution. 10-module deployment economics. Riyadh 21% of national waste market.

SP-01 · SP-KSA

In-Country Off-take Study

SABIC carbon outputs, Aramco advanced materials R&D, Riyadh cement industry (Pozzolanic SCM), NEOM OXAGON. All CANDIDATE. In-country premium rationale at 10-module Riyadh scale.

SP-01 · SP-02

Executive Brief

Two gaps — MWAN mandate and carbon product import dependency. Riyadh holds 21% of national waste and 40% of commercial waste market revenue. Action required Q3 2027 to preserve Q4 2027 T0.

SP-02 · Decision

Partner Benefits

$550M Carbotura FDI. Zero Authority capital. 470 direct FTE (Nitaqat-compliant). MWAN 350,000 tpy. Vision 2030 SGI/NIDLP alignment. Qiddiya, Diriyah, King Salman Park C&D stream integration.

SOVEREIGN IMPACT · BALANCE SHEET

What this region exchanges

Waste cost eliminated / yr
SAR 96.7M ($25.8M)
FWDC × Phase 1 tpy ESTIMATED
Legacy landfill (ESTIMATED)
~65M tonnes (potential 80–120M)
conservative estimate · site audit required ESTIMATED
Exogenesis Royalty TO Kingdom (total)
$3,250M (SAR 12,188M)
$50/tonne × legacy volume ESTIMATED
Exogenesis Programme annual royalty (Year 4–5)
$325M / yr (SAR 1,219M)
staggered start per regional COD ESTIMATED
CO₂e avoided / yr (Phase 1)
1,332,250 tCO₂e
133,225 × 10 modules · SA_15 locked rate ESTIMATED
Circular Royalty Stream 1 (Year 2)
$15.75M / yr
SA_15 placeholder rate ESTIMATED
Carbotura FDI (Phase 1)
$550M (SAR 2,063M)
10 modules × $55M LOCKED
Authority capital required
$0 USD (SAR 0)
no Authority outflow at any phase LOCKED

EXOGENESIS PROTOCOL · LEGACY LANDFILL REMEDIATION

Urban Mining — Near-Zero by Design

"The Exogenesis Protocol for Urban Mining — Carbotura's Near-Zero Emissions, Near-Zero Waste, Near-Zero Discharge approach to legacy landfill recovery. Operating under a sealed, advancing membrane enclosure with point-of-excavation gas capture via the Atmospheric Protection System (APS) and a fully electric, remotely operated excavation fleet. No personnel enter the enclosure under any operational condition."

نُقدِّم هذه البوابة باللغة العربية الفصحى حرصاً منّا على التواصل الواضح مع شركائنا في المملكة العربية السعودية. نُدرك أن الترجمة من اللغة الإنجليزية قد لا تخلو من أخطاء أو سهو، ونطلب منكم كرم العفو والتسامح. يسعدنا استقبال أي ملاحظات أو تصحيحات تُعينونا على تحسين دقة المحتوى.