Sharia-Structured Instrument Ijarah (manufacturing and processing service) + Musharakah (revenue participation in manufactured goods). Two independent transactions — never combined or netted. Formal Sharia Board review recommended prior to CSA execution.
All financial figures prepared under IFRS. SAR primary / USD secondary. SAR/USD 3.75 (pegged, VERIFIED).

Two firsts nationally: Saudi Arabia's first IGCC ash processor. Saudi Arabia's first subtropical agricultural biochar. Both unavailable in any other region.

Opening

Jazan generates an estimated 1,800 TPD across seven material streams — including two that exist nowhere else in the Kingdom: IGCC gasification slag from ACWA Power's 2,400 MW complex (the only industrial-scale IGCC facility in Saudi Arabia) and agricultural biomass from the subtropical Tihamah coastal and Aseer highland crop corridor (mango, banana, coffee, papaya). Phase Initial targets 100 TPD (1 module, $55M USD / SAR 206.25M Carbotura FDI) at Q4 2031 COD, scaling to 200 TPD full programme ($110M USD / SAR 412.50M Carbotura FDI).

Gap 1

MWAN Mandate — No Southern Region Processor

85% diversion by 2035. The Southern Region has the fewest alternative advanced processors in the Kingdom. Jazan's MWAN compliance path has no fallback if ACM is not deployed. IGCC ash has no designated processor anywhere in Saudi Arabia.

70,000 tpy MWAN contribution at full programme
Gap 2

IGCC V₂O₅ + Biochar — First-of-Kind

IGCC gasification slag vanadium has never been recovered in Saudi Arabia. Subtropical biochar has never been produced at commercial scale in the Kingdom. Both are import substitution opportunities with no domestic competitor. Both require Jazan ACM to exist.

0 IGCC processors · 0 commercial biochar producers in KSA

Carbotura Phase Initial (100 TPD, Q4 2031 COD) is the only pathway to close both gaps in the Southern Region. Subject to WARN-08 for IGCC V₂O₅.

The Decision

THIS BRIEF MODELS OPTION A — STANDARD ELECTION

Option A-IC (IGCC ash V₂O₅ to Aramco Jizan VRFB supply chain) requires WARN-08 engineering confirmation — IGCC slag characterization and petcoke ash analysis must be completed before any V₂O₅ volume appears in client documents. Base case does not require this confirmation.

The Circular Supply Agreement authorises Carbotura to operate an Advanced Circular Manufacturing centre at RCJY Jazan IC Phase II (Manufacturing Site Deed: RCJY · CSA: Saudi Investment Recycling Company (SIRC), 100% PIF subsidiary). Two independent agreements — two independent counterparties. ACWA Power IGCC ash requires a third, separate feedstock agreement as prerequisite for IGCC stream processing.

  • Processing Service (Ijarah): Authority pays for a manufacturing and processing service per ton processed — Year 1
  • Manufactured Goods Revenue Share (Musharakah): Authority receives a share of manufactured output revenue, 13 months after each corresponding Processing Service payment — from Month 14 onward
  • Zero capital obligation: Carbotura designs, finances, builds, owns, and operates. LOCKED.

Key Facts

Addressable streamsMSW residuals · ELT · IGCC ash · Petcoke ash · Agricultural biomass · Wastewater sludge · C&D fluffLOCKED
Total addressable TPD~1,800 TPD ESTIMATEDESTIMATED
IGCC ash (ACWA Power)First-of-kind in KSA — gasification slag chemistry distinct from combustion ashWARN-08
Agricultural biochar~350 tpy Phase Initial · ~700 tpy full programme — subtropical unique nationallyESTIMATED
Phase Initial100 TPD · 35,000 tpy · 1 moduleLOCKED
Full programme200 TPD · 70,000 tpy · 2 modulesLOCKED
Carbotura FDI (Phase Initial)$55M USD (SAR 206.25M)LOCKED
Carbotura FDI (full programme)$110M USD (SAR 412.50M)LOCKED
FWDCSAR 260/ton ESTIMATED — lowest in KSA programmeESTIMATED ⚠ WARN-01
Revenue Share lag13 months rolling · independent transactionALWAYS
Capital obligationZeroLOCKED
T0Q2 2029ESTIMATED
Phase Initial CODQ4 2031ESTIMATED
First Revenue Share~Q1 2033DERIVED
Direct FTE (full programme)94 · Subject to Nitaqat complianceESTIMATED
Carbon avoidance (full programme)266,450 tCO₂e/yr · SGI contributionESTIMATED
MWAN contribution (full programme)70,000 tpy toward 2035ESTIMATED
V₂O₅ outputTBD — IGCC slag and petcoke ash analysis required (WARN-08)WARN-08
Primary ICO buyers (CANDIDATE)Aramco Jizan VRFB (WARN-08) · Ma'aden soil remediation (biochar) · SGI afforestation (biochar)CANDIDATE
Site counterpartyRCJY (Royal Commission for Jubail and Yanbu — Jazan zone)LOCKED
CSA counterpartySaudi Investment Recycling Company (SIRC) — 100% PIF subsidiaryLOCKED

Cost of Delay

Each 12-Month T0 Slip
  • IGCC gasification slag — a first-of-kind ash stream with no processor in Saudi Arabia — continues to accumulate as an unresolved disposal liability at ACWA Power's 2,400 MW complex
  • Subtropical agricultural biochar continues not to be produced — no competitor will develop this capability independently in Jazan
  • Southern Region has no fallback processor — MWAN 2035 compliance exposure has no alternative pathway
  • Aramco Jizan VRFB supply chain remains import-dependent for V₂O₅ for another year against the 110 GW renewable target

Call to Action

Authorise the Authority Feasibility Study — the single action that preserves Q2 2029 T0.

The Feasibility Study resolves:

  • RCJY Jazan actual gate rates and stream volumes (WARN-01)
  • RCJY Jazan IC Phase II land allocation
  • ACWA Power IGCC ash feedstock agreement engagement (prerequisite for WARN-08)
  • IGCC slag and petcoke ash sampling — vanadium concentration analysis (WARN-08)
  • Nitaqat tier with HRSD (WARN-03) — Southern Region workforce structure
  • Agricultural biomass supply chain engagement — crop residue volumes and seasonal calendar
  • Ma'aden and SGI biochar procurement engagement (first ICO track — no engineering risk)

Authorization required by Q1 2029 to preserve Q2 2029 T0.

Contact: info[at]carbotura.com

Sources & Legal

Registry: registry-jazan-v1. All figures ESTIMATED unless LOCKED. IFRS basis. SAR/USD 3.75 (pegged, VERIFIED).